Construction Photos
|
|
|
|
|
work day w/ stadium in background |
flex duct to diffuser (yet to be installed) |
connection to solar collector |
|
|
|
|
|
Outlet of ductwork to be attached to dehydrator once it is finished |
The group assembles the frame to hold the solar panels |
The hot water return piping enters the solar collector plate |